Ascend Archive
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

(ASCEND) 6.0.0 for the Pipelines



Release 6.0.0 for the Pipelines has been given to support.  This release
contains the following:

New features:

* Separate WAN counter
* Clear ARP cache set command
* Serial download fail-safe test
* Dual POTS specification menu
* Expand connection profiles from 8 to 16
* Support nailed channels to different destinations
* Show DHCP command added to terminal-server
* Pipeline15 2-channel MP+ SecureID authentication
* IPSec code turns on Secure Access

Corrections:

TR    Description of Change
----  ------------------------------------------------------
1690  The show fr dlci command gave incorrect (negative) results.
2065  P130 IPX RIP and SAP packets did not propagate to Cisco 2503
2086  P50 SAP table didn't propagated to a nailed 56K link on startup
2409  Pipeline 50 ignored RIP V2 next hop gateway address
2460  P75 delivers alternating tone on POTS after call is terminated
2562  Pipelines do not have the 224.0.0.9 multicast option for RIP-v2
2573  Listen command is unavailable in X.25PAD
2672  Configurator (JBPC) does not work with b2ix.p75
2814  NAT overruns buffer
2831  P15 sends "PPP" as user name and password
2858  Pipeline 130 not forwarding RIP or IP broadcasts when bridging
2903  Noncompliance with SPID initialization specs (Bellcore SR 3339)
250047 No Dial tone in UK on the P75 and P25 with 5.0Ap1 and above
250086 P130 ISDN backup link didn't close after primary link returned
250101 P75 Expect Callback does not work when using NAT
250162 Callback resulted in a LAN Security error

No Pipeline 25 loads were released in 6.0.0.




Kevin


++ Ascend Users Mailing List ++
To unsubscribe:	send unsubscribe to ascend-users-request@bungi.com
To get FAQ'd:	<http://www.nealis.net/ascend/faq>